Hello, we were given the following schedule for Red Bird and Dekorra Road work:
(weather permitting)
May 16th – mill off the asphalt
May 16-17th – grading
May 18th – paving
May 19th – extra day (if needed)
Prior to those dates residents likely be seeing locates done and flags will be placed along the utility lines. Please leave those flags in place until the project is completed. The contractor (Tri-County) will be delivering more information to each resident as well.
Residents should be able to access their driveways during this project with the exception of when work is being done directly in front of the driveway.